Dumpster Permits in Dallas and Fort Worth (2026)

A dumpster on your own driveway in Dallas or Fort Worth needs no city permit; on a street or alley, Fort Worth charges $112.50 and Dallas discourages it.

By White Rock Waste Solutions ·

A dumpster entirely on your own driveway in Dallas or Fort Worth needs no city permit, but one in a street, alley, or right-of-way does: Fort Worth charges $112.50 for a street use permit, and Dallas requires a barricade permit.

That split covers almost every job. The permit rules below are for public property: the street, the curb, the sidewalk, the alley, and the city-owned strip along them. Your driveway, your garage apron, and your yard are yours, and a city right-of-way permit does not apply there. Deed restrictions and HOA rules are a separate question that the city does not answer for you.

Dallas and Fort Worth side by side

City of Dallas City of Fort Worth
Private driveway No right-of-way permit No right-of-way permit
Street, alley, or sidewalk Barricade permit for construction debris in a public way; traffic control permit if a lane, sidewalk, or alley is blocked Temporary Street Use Permit
Who issues it Building official (barricade); Public Works (right-of-way and traffic control) Transportation and Public Works, Right-of-Way Permits
Fee Not listed on a current city page; ask the city $112.50 street use permit; $0.03 per sq ft per day if occupied more than 3 days
Lead time Not published for this permit 3 to 5 business days minimum
Insurance Liability insurance naming the city, plus a signed indemnification agreement Certificate of insurance naming the city as additional insured

Dallas: plan on the driveway

Dallas does not publish a dumpster permit as such. Three city sources cover the ground instead.

The city’s construction code, Chapter 52, says no construction or demolition activity, including “storage of materials, supplies, or debris,” may take place on public property or in a public way without a barricade permit from the building official. A barricade permit is also required for any temporary blocking of a street or sidewalk. The holder must repair any street, curb, sidewalk, or drainage structure damaged inside the barricaded area. A remodel dumpster parked in the street is debris storage in a public way, so this is the permit that fits.

The barricade permit checklist lists what the application needs: proof of commercial general liability and auto liability insurance of at least $500,000 per occurrence naming the city as additional insured, the city’s own indemnification agreement signed by the contractor, and a street closure form from the Department of Transportation.

Dallas Public Works adds a traffic control permit whenever work will close a traffic lane or block a sidewalk or alley, with a traffic control plan attached. Applications go through the city’s Right-of-Way Permit Management System, and questions go to Public Works at 214-948-4290.

The city has also said, in its tornado recovery FAQ, that “dumpsters are not allowed to be parked in the City of Dallas Right-of-Way.” That answer was written for storm cleanup, but it tells you how the city views a container in the street. In Dallas, the practical answer is the driveway, the garage apron off the alley, or a crew with a truck instead of a container.

Fort Worth: a $112.50 street use permit

Fort Worth spells it out. Its Temporary Street Use Permit requirements, revised April 2025, set these rules:

  • At least 3 to 5 business days of lead time for any temporary street use request.
  • A “Street Use Other” permit fee of $112.50, paid before the city releases the issued permit.
  • A certificate of insurance listing the City of Fort Worth, its officers, and employees as additional insured.
  • A traffic control plan. The city’s typical plans are published online; a site-specific plan must be signed and sealed by an engineer.
  • A Temporary Encroachment Permit if city right-of-way on a private project is occupied and closed to the public for more than three days, billed at $0.03 per square foot per day for lane or street space and $0.015 for sidewalk space.

There is a separate non-construction application for street use that is not construction work. Permits are submitted through the city’s Accela Citizen Access portal, per the TPW contractor page, which also warns that equipment and materials cannot be stored in the right-of-way without prior approval and that the right-of-way team can fine violators.

Arlington: a traffic control permit

Arlington’s Streets and Sidewalks chapter makes it an offense to obstruct any street, sidewalk, curb, or public right-of-way. Section 6.06, added in September 2025, requires a Temporary Traffic Control Permit to temporarily restrict vehicle or pedestrian access on a street. Apply at least five business days ahead with a traffic control plan, a diagram, and proof of insurance. The fee is set by City Council resolution and is not printed in the code.

Before you book a street placement

  1. Measure the driveway first. Our container is 16 feet long and 8 feet wide, and the truck needs room to back in. Most two-car driveways take it, which skips the permit entirely. The size guide covers the footprint.
  2. Check the alley. In Dallas especially, an alley-loaded garage apron can hold the container off the public way. It cannot block the alley.
  3. Count the days. In Fort Worth, a street placement longer than three days adds the encroachment permit.
  4. Settle who files. The city will want insurance naming it as an additional insured before it issues anything.
  5. Consider a truck instead. If there is truly nowhere off the street, junk removal versus a dumpster is worth a look, since a crew loads and leaves the same day.

How White Rock can help

Tell us where the container will sit when you book dumpster rental in Dallas, Fort Worth, or anywhere in DFW. A 16-foot roll-off fits most driveways, and if your address is one where the street is the only option, we tell you before delivery so the permit question is settled first. Book online or call (945) 334-3228.

Sources

  1. City of Dallas Public Works: Right-of-Way Management
  2. City of Dallas: Chapter 52, Administrative Procedures for the Construction Codes (booklet)
  3. City of Dallas Building Inspection: Barricade Permit Application Checklist
  4. City of Dallas Tornado Recovery: FAQs for Multifamily and Commercial Structures
  5. City of Fort Worth TPW: Information for Contractors
  6. City of Fort Worth TPW: Requirements for a Temporary Street Use Permit (rev. April 2025)
  7. City of Fort Worth TPW: Temporary Street Use Permit Application, Non-Construction
  8. City of Arlington Code of Ordinances: Streets and Sidewalks Chapter (amended Sept. 2, 2025)
FAQ

Questions about this guide

Didn’t find your answer? A dispatcher picks up Mon–Fri 8am–6pm, Sat 8am–1pm CT.

or send the details with photos →Browse every question we get asked →
01How far ahead do I have to apply for a Fort Worth street use permit?
At least 3 to 5 business days before the container arrives, according to Fort Worth Transportation and Public Works. The permit fee of $112.50 has to be paid before the city releases a copy of the issued permit. Build that lead time into the delivery date rather than booking for tomorrow.
02What does Fort Worth charge if a dumpster stays in the street for more than three days?
Fort Worth requires a Temporary Encroachment Permit when right-of-way on a private project is occupied and closed to the public for more than three days. Lane or street space is billed at $0.03 per square foot per day and sidewalk space at $0.015. A 16 by 8 foot container covers 128 square feet, about $3.84 a day for the box itself, before any extra area the traffic control plan closes.
03Who applies for the street permit, the homeowner or the hauler?
Both Dallas and Fort Worth ask for proof of liability insurance that names the city as an additional insured, which most homeowners do not carry. Dallas also requires a signed indemnification agreement on the city's own form, and Fort Worth's application asks for a 24-hour emergency contact. In practice the permit is filed by whoever holds that insurance and controls the work, so settle it before the delivery date.
04Can I put a dumpster in my alley in Dallas without a permit?
Not if it blocks the alley. Dallas Public Works requires a traffic control permit when work will block a traffic lane, a sidewalk, or an alley, and the city's construction code requires a barricade permit for debris stored in a public way during construction or demolition. A container on your own garage apron, fully off the alley, is on private property.
05Does Arlington require a permit to put a dumpster in the street?
Arlington's code makes it an offense to obstruct any street, sidewalk, curb, or right-of-way, and Section 6.06 requires a Temporary Traffic Control Permit to restrict vehicle or pedestrian access on a street. The application is due at least five business days ahead with a traffic control plan and proof of insurance. Restrictions shorter than four hours on a single day are exempt, which a multi-day container is not.
Ready when you are

Book the truck or the box online

Pick a date on the live calendar, or call dispatch at (945) 334-3228 and describe the job.

Get in touch

Schedule online or send us the details

Know what you need? Pick a date and time from the live calendar. Want a number first? Send the details. We respond within 15 minutes during staffed business hours.

  1. Response within 15 minutesDuring staffed business hours. A real dispatcher, not an auto-responder.
  2. You get one flat numberMost jobs are quoted from your description and a few photos. No site visit, no hourly billing, no dump fees added later.
  3. Pick your date and timeApprove the price and choose a date and a two-hour arrival window from the live calendar. The crew calls when they are on the way.

Request a quote or proposal

Photos (optional, up to 3)

A few photos help us quote a flat price without a site visit.

By submitting, you agree to be contacted about your request. We never sell or share your information.